14A Tunnel for connection
to contract 3 |
14A tunneling at West Rd and Telge |
14B staging along HCFCD |
| |
|
|
 |
 |
 |
| 14B open cut installation |
24-inch KROHNE Meters Installed in
Meter and Flow Control Station |
7A 36 inch drainline and manhole
installation |
| |
|
|
 |
 |
 |
| 7A along formerly Exxon easement |
Concrete foundation installed for
pump building |
Construction of disinfection facility |
| |
|
|
 |
 |
 |
| Disinfection Building Aerial
Partially Complete |
Disinfection Building, Storage
Building, and Parking Area |
Foundation for pump and switchgear
building |
| |
|
|
 |
 |
 |
| Installation of 36-inch Riser Piping |
Meter and Flow Control Station
Incoming to Plant Site |
Pump and switchgear structural |
| |
|
|
 |
 |
 |
| Pump building |
Pump Station 5 MG Storage Tank
Scaffolding Wall Panels and Dome Panels |
Pump Station 7500 gpm horizontal
split case pump |
| |
|
|
 |
 |
 |
| Pump Station overflow piping |
Pumps with Motors |
Storage Building and Parking Area
Aerial |
| |
|
|
 |
 |
 |
| Storage Building Structural Steel
With Tank and Disinfection Building |
Storage Tank Painting |
Suction Header With Pumps and Motors |
| |
|
|
 |
 |
 |
| Switchgear Building, Pumpstation
Foundation, With Transformer and Generator Pads |
Switchgear Conduit Stub Ups and
Formwork String Lines |
Switchgear from top of tank |
| |
|
|
 |
 |
 |
| Switchgear, Pumpstation Piping and
Detention Area |
Switchgear |
Tank view of generators and
enclosures |
| |
|
|
 |
 |
 |
| Transformer Pad Conduit |
Winding Wire Installation 2 |
Winding Wire Installation |