14A Tunnel for connection
to contract 3
14A tunneling at West Rd and Telge 14B staging along HCFCD
     
14B open cut installation 24-inch KROHNE Meters Installed in Meter and Flow Control Station 7A 36 inch drainline and manhole installation
     
7A along formerly Exxon easement Concrete foundation installed for pump building Construction of disinfection facility
     
Disinfection Building Aerial Partially Complete Disinfection Building, Storage Building, and Parking Area Foundation for pump and switchgear building
     
Installation of 36-inch Riser Piping Meter and Flow Control Station Incoming to Plant Site Pump and switchgear structural
     
Pump building Pump Station 5 MG Storage Tank Scaffolding Wall Panels and Dome Panels Pump Station 7500 gpm horizontal split case pump
     
Pump Station overflow piping Pumps with Motors Storage Building and Parking Area Aerial
     
Storage Building Structural Steel With Tank and Disinfection Building Storage Tank Painting Suction Header With Pumps and Motors
     
Switchgear Building, Pumpstation Foundation, With Transformer and Generator Pads Switchgear Conduit Stub Ups and Formwork String Lines Switchgear from top of tank
     
Switchgear, Pumpstation Piping and Detention Area Switchgear Tank view of generators and enclosures
     
Transformer Pad Conduit Winding Wire Installation 2 Winding Wire Installation