|
Photos Uploaded 7-29-2008 |
| |
|
|
 |
 |
 |
14A Tunnel for connection
to contract 3 |
14A tunneling at West Rd and
Telge |
14B staging along HCFCD |
| |
|
|
 |
 |
 |
|
14B open cut installation |
24-inch KROHNE Meters
Installed in Meter and Flow Control Station |
7A 36 inch drainline and
manhole installation |
| |
|
|
 |
 |
 |
|
7A along formerly Exxon
easement |
Concrete foundation
installed for pump building |
Construction of disinfection
facility |
| |
|
|
 |
 |
 |
|
Disinfection Building Aerial
Partially Complete |
Disinfection Building,
Storage Building, and Parking Area |
Foundation for pump and
switchgear building |
| |
|
|
 |
 |
 |
|
Installation of 36-inch
Riser Piping |
Meter and Flow Control
Station Incoming to Plant Site |
Pump and switchgear
structural |
| |
|
|
 |
 |
 |
|
Pump building |
Pump Station 5 MG Storage
Tank Scaffolding Wall Panels and Dome Panels |
Pump Station 7500 gpm
horizontal split case pump |
| |
|
|
 |
 |
 |
|
Pump Station overflow piping |
Pumps with Motors |
Storage Building and Parking
Area Aerial |
| |
|
|
 |
 |
 |
|
Storage Building Structural
Steel With Tank and Disinfection Building |
Storage Tank Painting |
Suction Header With Pumps
and Motors |
| |
|
|
 |
 |
 |
|
Switchgear Building,
Pumpstation Foundation, With Transformer and Generator Pads |
Switchgear Conduit Stub Ups
and Formwork String Lines |
Switchgear from top of tank |
| |
|
|
 |
 |
 |
|
Switchgear, Pumpstation
Piping and Detention Area |
Switchgear |
Tank view of generators and
enclosures |
| |
|
|
 |
 |
 |
|
Transformer Pad Conduit |
Winding Wire Installation 2 |
Winding Wire Installation |