A Brief History of the West Harris County Regional Water Authority

The West Harris County Regional Water Authority (“WHCRWA”) was created by House Bill 1842 (the “Act”), introduced by State Representative Bill Callegari and sponsored in the Senate by Senator Jon Lindsay. The bill was approved by the 77th Texas Legislature, signed into law by Texas Governor James Richard Perry on May 28, 2001, and immediately went into effect. The City of Katy consented to the creation of the WHCRWA on May 21, 2001, and the City of Houston consented on June 6, 2001.

The WHCRWA was created to accomplish the purposes of provision of surface water and groundwater for various uses, the reduction of groundwater withdrawals, the conservation, preservation, protection, recharge, and prevention of waste of groundwater and of groundwater reservoirs, the control of subsidence caused by withdrawal of water from those groundwater reservoirs, and other public purposes stated in the Act.

A Board, made up of nine directors who serve staggered four-year terms, governs the WHCRWA. Directors must: (i) be at least 18 years of age; (ii) be a Texas resident; (iii) own land or be a qualified voter within the director precinct; and (iv) have served as a director of one or more districts for a total of at least four years. To serve as a director representing any part of the City of Katy, the individual must (i) meet the other specified qualifications, and (ii) must either meet the requirement of having served as a director of one or more districts for at least four years, or must have served as the mayor or a member of the city council of the City of Katy.

Meet the Board

Eric Hansen

Eric Hansen

President and Precinct 3 Director

Larry A Weppler

Larry A Weppler

Vice President and Precinct 1 Director

Gary Struzick

Gary Struzick

Assistant Vice President and Precinct 7 Director

Douglas (Cam) Postle

Douglas (Cam) Postle

Secretary and Precinct 6 Director

Michael Thornhill

Michael Thornhill

Assistant Secretary and Precinct 4 Director

Jay Wheeler

Jay Wheeler

Precinct 2 Director

Karla Cannon

Karla Cannon

Precinct 5 Director

Mark G. Janneck

Mark G. Janneck

Precinct 8 Director

Dennis Gorden

Dennis Gorden

Precinct 9 Director

The WHCRWA has completed its Groundwater Reduction Plan “GRP” certification and gained Harris Galveston Subsidence District (“Subsidence District”) approval in compliance with the Subsidence District’s regulations requiring GRP. The Subsidence District’s regulations require conversion to alternate water via a 30% reduction of groundwater usage by 2010, 60% by 2025, and 80% by 2035. Alternate water is typically surface water but can include conservation, direct or indirect reuse, or stormwater capture. Effective January 1, 2026, the Subsidence District has implemented a $12.52 per 1,000 gallon disincentive fee for those failing to comply with these reductions.

30% reduction of groundwater usage by 2010 – ACCOMPLISHED
60% reduction of groundwater usage by 2025 – ACCOMPLISHED
80% reduction of groundwater usage by 2035

Successful negotiations with the City of Houston yielded a mutually satisfactory long-term water supply contract between the WHCRWA and the City of Houston. The WHCRWA continues to implement numerous surface water delivery projects to deliver water to utility districts, and the first surface water was delivered in September 2005.

The WHCRWA charges fees for surface water delivered by the WHCRWA and for groundwater pumped by various water well owners within its GRP. To date, WHCRWA has held numerous successful Bond Sales that have funded the many Capital Improvement Projects and paid the City of Houston for water supplies required by the long-term contract.

WHCRWA continues to expand its internal distribution system to deliver treated surface water to local water providers within its boundaries.

As of October 2026, WHCRWA’s system includes:

  • 81.9 miles of internal water distribution lines.
  • Two operating pump stations with a combined pumping capacity of 200 million gallons per day.
  • One additional pump station under construction with a pumping capacity of 160 million gallons per day.
  • 69 water plants receiving surface water.

In addition to its aggressive water line construction efforts, the WHCRWA has been active in promoting water conservation education programs for use in public schools within their boundaries and for area residents. Each year, the WHCRWA produces a newsletter in order to provide current information about critical water issues.  The WHCRWA also maintains this website that contains pertinent information about the WHCRWA, its construction projects, and ways to use our precious water supplies more efficiently.

0
Approximate square miles in WHCRWA
0
Miles of internal water distribution lines
0
Water plants receiving surface water as of October 2026
0
Pump Stations with a combined pumping capacity of 200 million gallons per day
0
Additional pump station under construction with a pumping capacity of 160 million gallons per day
0+
More than 150 MUDs as of October 2026
0
Estimated people within the WHCRWA’s boundaries as of 10/2026

Within the WHCRWA’s boundaries, there are:

  • Approximately 232 square miles
  • A population of approximately 648,500
  • More than 150 Municipal Utility Districts
  • Portions of the City of Katy

To date, the WHCRWA’s system includes:

  • Two operating pump stations with a combined pumping capacity of 200 million gallons per day
  • One additional pump station under construction with a pumping capacity of 160 million gallons per day
  • 81.9 miles of internal water distribution lines
  • 69 water plants receiving surface water
  • An electronic monitoring system
  • A web-based GIS system

About WHCRWA Pump Station No. 1

  • Firm capacity of 37,500 gallons per minute
  • Began operation on June 24, 2008
  • Construction cost of $16.3 million
  • Three 5-million-gallon ground storage tanks with a total storage capacity of 15 million gallons
  • Two 2-megawatt emergency generators

About WHCRWA Central Pump Station

  • Began pumping treated surface water into the WHCRWA system on June 2, 2026
  • Receives treated surface water from the Northeast Water Purification Plant through the Surface Water Supply Project
  • Includes two 15-million-gallon ground storage tanks with a combined storage capacity of 30 million gallons
  • Located on approximately 29 acres
  • Includes approximately 29,225 square feet of operations and pumping facilities
  • Provides the pressure needed to move treated surface water into WHCRWA’s internal distribution system for delivery to local water providers

Click here for information on WHCRWA water supply projects.